Ariel at UBC
Other
About the Project
The Stores Building was the first phase of the Advanced Rare Isotope Laboratory (ARIEL) project on the TRIUMF campus at Wesbrook Mall, UBC. The ARIEL project was constructed within an existing site and infrastructure system. H.Y. Engineering Ltd. prepared the designs for the on-site service connections and the relocation of existing storm, sanitary, and water mains. Further, H.Y. Engineering Ltd. provided a site grading plan with drainage details, on-site road works, curbs, gutters, and sidewalks, and also designed the Erosion and Sediment Control (ESC) system for surface areas affected during construction.
Location | Surrey |
Services | Civil Engineering |
Get In TouchLet’s Connect, We’re Here to Help
If you are embarking on a new project, let H.Y. Engineering and H.Y. Surveying help! We have expertise in design, construction and project management, and can provide valuable insights and solutions. From initial planning, to final execution, collaborating with H.Y. Engineering and H.Y. Surveying will ensure a well-rounded approach, technical competence, and a successful outcome for your project.