This challenging subdivision required constant coordination and consultation with the neighboring property owners regarding tree removal/retention, and half road construction. This subdivision was able to create a connection through this neighborhood for both vehicle traffic and pedestrians while maintaining the neighborhood character created by the surrounding developments. Our services included preparation of the subdivision layout and the interface with the surrounding properties, obtaining Council approval for the rezone, designing the; new road networks, storm sewer systems, sanitary sewer systems, and water mains, coordination with the project contractor to inspect all civil works, and address ESC monitoring to confirm bylaw compliance.
Obtaining Government Agency Approvals
27 Lot Subdivision – Surrey

Oakridge in Vancouver

H.Y. Engineering is providing Civil Engineering and Construction services for the redevelopment of the Oakridge Mall. The redevelopment involves the demolition of the majority of the existing mall and construction of approximately 14 residential towers and new retail and office space. HY Engineering’s role was to design on-site servicing to allow for phased demolition and construction and to design off-site roads, sewers and water mains to service the new development. H.Y. Engineering also provided full time inspection services and contract administration services.
SOCO in Coquitlam

SOCO by Anthem Properties is a high density mixed-use, multi-phased development in the Burquitlam-Lougheed neighbourhood of Coquitlam. It is a transit oriented development within walking distance to Lougheed Town Centre SkyTrain Station.
The civil works included a new road network, including a new road connection between North Rd & Lougheed Hwy, to help alleviate traffic congestion at the North Rd & Lougheed Hwy intersection. It also included a complex retaining wall, moment slab, and traffic barrier adjacent to the existing H-Mart building to accommodate steep slopes on the site.
The civil utilities included a large diameter sanitary sewer which connected to a large diameter Metro Vancouver trunk sewer, and included a detailed permitting process and night-work on North Road. It also included new storm sewers and watermains to service the development and new traffic signals on North Road.
The project also required permitting from the Ministry of Transportation and Infrastructure due to proximity to Hwy #1 and the closure of Delestre Ave.
Georgetown Phase 1 in Surrey, BC

Georgetown is a multi-phased and multi-year mixed-use development in the City Centre area within the City of Surrey. Anthem Properties is nearing completion of Phase 1, which is comprised of the first, 30-storey residential tower with mixed use commercial podium. There are nearly ten subsequent phases planned and H.Y Engineering is currently working on the detailed design for Phases 2, 3, and 4 across the street.
20 Lot Subdivision in South Newton

H.Y. Engineering Ltd. was involved with this project from initiation to completion including planning services to coordinate the rezoning and subdivision of the property with the City, and preliminary design of the subdivision layout and servicing concepts and alternatives. On-site and off-site design services included lot grading design, stormwater control plans, site servicing, roadworks with bus bay, and complex retaining walls. Erosion and Sediment Control (ESC) design, ESC monitoring, and construction inspection services were also provided for this project.