Fire Hall No. 8 in Abbotsford
H.Y. Engineering worked with Chernoff Thompson Architects to develop the site servicing for the new Fire Hall No. 8 in Abbotsford. The off-site servicing involved the design of the new driveway, and upgrades to the curbs, gutters and sidewalks, as well as the design of aquatic features for storm water infiltration and retention. The on-site components included lot grading details, parking layout, and designs for water, storm, and sanitary service connections. H.Y. Engineering Ltd. also provided tender and contract administration services, as well as construction inspection for both off-site and on-site civil construction with reporting to the City of Abbotsford.