23 Lot Subdivision in Surrey

Overview

  • Retained Trees
  • Services Extended through Park
  • Abandon of Temporary Services

Services

  • Civil Engineering
    • Construction Tender, Supervision, Inspection & Contract Administration
    • Cost Estimates & Proformas
    • Off-Site Civil Designs
  • Surveying
    • Construction Layouts

This twenty-three lot subdivision retained the existing house on-site with a number of significant trees.  H.Y. Engineering Ltd. designed the off-site services which included the connection of 82 Avenue and abandoning the temporary water, sanitary, storm, and hydro/tel on 154th Street, further the design of 154B Avenue through the park site in order to create a connection for future development.