23 Lot Subdivision in Surrey
This twenty-three lot subdivision retained the existing house on-site with a number of significant trees. H.Y. Engineering Ltd. designed the off-site services which included the connection of 82 Avenue and abandoning the temporary water, sanitary, storm, and hydro/tel on 154th Street, further the design of 154B Avenue through the park site in order to create a connection for future development.