20 Lot Subdivision in Langley

Overview

  • Single Family Residential Lots
  • Fraser Highway Landscape Buffer
  • CPTED features for Public Walway

Services

  • Civil Engineering
    • Construction Tender, Supervision, Inspection & Contract Administration
    • ESC Design & Monitoring
    • Off-Site Civil Designs
    • Project Management
  • Planning
    • Detailed Subdivision Design Layouts
    • Land Development Feasibility Studies
    • Subdivision & Rezoning Applications
  • Surveying
    • Construction Layouts
    • Subdivision

This single family subdivision of 20 lots in Langley was located in an established neighbourhood.  We worked with the Township of Langley Planning and Development Department to determine the necessary public access walkway location.  Additional works were required to address the landscape buffer planting required along Fraser Highway in order to mitigate the noise and sightlines to the busy road.  The buffer design also demonstrates Crime Prevention Through Environmental Design (CPTED) and provides street furniture as an amenity feature for the neighbourhood.

The civil engineering works required for this subdivision development included on-site detention in order to address storm water run-off, a rear lot drainage system was also designed for the east portion of the lots.  The water main to these new lots is serviced through a looped water system.  In order to accommodate the new lots, upgrades were required to the existing off-site storm sewer main.

We completed this project with Platinum Enterprises ltd, with the assistant of the Landscape Architect, Arborist, Project Contractor, etc.