Services: Subdivision & Rezoning Applications

64th Avenue 14 Lot Subdivision in Cloverdale

123674A_64Ave

H.Y. Engineering has been involved with this project from feasibility to completion. The H.Y.E. Planning Department provided our Client with a feasibility study and preliminary cost analysis for the property. Planning services included liaison with the City and neighbouring property owners/developers to establish maximum development potential and cost savings opportunities beneficial to all parties.

Once the subdivision was approved, H.Y. Engineering provided subdivision layout and off-site design, project management services, construction services, Erosion and Sediment Control (ESC) design and monitoring, and inspection services. The designs illustrated a storm water management plan, lot grading and infiltration gallery details, sanitary main extension and connections, watermain extension and connections, and significant roadworks design including the upgrades of the existing 64th Avenue arterial road, the extension and completion of the 64A Avenue collector road, and a lane to be constructed behind the development all with required sidewalks, curbs, gutters, and streetlighting.

2 Lot Subdivision on the Panorama Ridge Hillside

113469_56th2Lot

H.Y. Engineering provided planning, engineering, and survey services for this private two lot subdivision on 56th Avenue in Surrey. The property is situated atop a steep slope, with properties below, requiring additional efforts for Erosion and Sediment Control (ESC) and storm water management design which involved significant coordination with the City of Surrey Planning Departments (Subdivision and Building Divisions), the City’s Engineering Department, and with various sub-consultants (geotechnical, landscape, building design, directional drilling etc.) to address the engineering concerns of the site. H.Y. Engineering prepared off-site designs illustrating lot grading, and connections to the sanitary, storm, and water services as well as provided the design for the Erosion and Sediment Control (ESC) system implemented for the construction of the new home on the property.

20 Lot Subdivision in South Newton

103112_20Lot

H.Y. Engineering Ltd. was involved with this project from initiation to completion including planning services to coordinate the rezoning and subdivision of the property with the City, and preliminary design of the subdivision layout and servicing concepts and alternatives. On-site and off-site design services included lot grading design, stormwater control plans, site servicing, roadworks with bus bay, and complex retaining walls. Erosion and Sediment Control (ESC) design, ESC monitoring, and construction inspection services were also provided for this project.

Cedar Creek Townhomes

092980_CedarCreek

This large multi-phased development, situated on Burke Mountain in Coquitlam, presented unique grading and stormwater retention and infiltration challenges due to the steep slope of the mountain. H.Y. Engineering coordinated with the City of Coquitlam Planning and Development Services Departments to obtain a Development Permit for the project, which included the preparation of the site servicing concept. H.Y. Engineering also provided engineering services for detailed design of the servicing and roadworks required for this project, as well as Erosion and Sediment Control (ESC) design and monitoring.

Langley Memorial Hospital Parking Lot Expansion

123555

H.Y. Engineering was invited to act as prime consultant for the parking lot expansion at the Langley Memorial Hospital. H.Y. Engineering Ltd. worked with the Township of Langley to obtain engineering and planning requirements and approvals for the expansion. On-site design services involved storm sewer drainage design, and roadworks drawings with parking lot layout, line markings, and grading details. The use of rain gardens for stormwater treatment, retention, and infiltration purposes were incorporated into the design. H.Y. Engineering Ltd. put out the call for tender of the civil, electrical, and landscape construction aspects of the project and provided contract administration and coordination on behalf of the Langley Memorial Hospital Foundation. The project met all Township standards and completed in 2014 with 710 new parking spaces for the hospital.

 
Page 1 of 2