250+ Single Family Lot Subdivision in Yorkson South

062520_Yorkson

H.Y. Engineering was retained as prime consultant to survey, design, manage, tender, and inspect this extensive 293 single-family lot subdivision in the Yorkson neighbourhood of Langley, BC. The on-site design requirements include the full layout and design of multiple roadways, lanes, and cul-de-sacs with curbs, bulges, gutters, sidewalks, cross sections, street lighting, and temporary roads as required. The design of a storm water management system involved using storm water modeling, flow calculations, the design aquatic habitat features, coordination for the design of rain gardens, and the assessment and coordination of existing detention ponds for expansion as required. Water connections from 80th Avenue were designed with calculations to ensure adequate flows. Storm sewer and sanitary sewer plans illustrated the extension of the trunk mains from the intersection of 81A Avenue and 212th Street to the intersection of 80th Avenue and 212th street.

The project further involved significant coordination with the Township of Langley for input and approvals on designs as well as for the preparation of latecomer agreements. Erosion and Sediment Control design was prepared and monitored by H.Y. Engineering as well as construction inspection with reports to the Township of Langley.

 

Fire Hall #8

103235_FH8

H.Y. Engineering worked with Chernoff Thompson Architects to develop the site servicing for the new Fire Hall #8 in Abbotsford. The off-site servicing involved the design of the new driveway, and upgrades to the curbs, gutters and sidewalks, as well as the design of aquatic features for storm water infiltration and retention. The on-site components included lot grading details, parking layout, and designs for water, storm, and sanitary service connections. H.Y. Engineering Ltd. also provided tender and contract administration services, as well as construction inspection for both off-site and on-site civil construction with reporting to the City of Abbotsford.

LA VIA Port Coquitlam

103112_LaViaPOCO

LA VIA Port Coquitlam is a 34 unit condominium development with underground parking that was completed by Circadian Developments Ltd. in March, 2014. H.Y. Engineering Ltd. provided off-site design services and revised to those designs to incorporate the acquisition of an additional lot to the development. H.Y. Engineering also provided Project Management, Erosion and Sediment Control (ESC) Design and Inspection, as well as Construction Inspection Services.

 

 

20 Lot Subdivision in South Newton

103112_20Lot

H.Y. Engineering Ltd. was involved with this project from initiation to completion including planning services to coordinate the rezoning and subdivision of the property with the City, and preliminary design of the subdivision layout and servicing concepts and alternatives. On-site and off-site design services included lot grading design, stormwater control plans, site servicing, roadworks with bus bay, and complex retaining walls. Erosion and Sediment Control (ESC) design, ESC monitoring, and construction inspection services were also provided for this project.

Cedar Creek Townhomes

092980_CedarCreek

This large multi-phased development, situated on Burke Mountain in Coquitlam, presented unique grading and stormwater retention and infiltration challenges due to the steep slope of the mountain. H.Y. Engineering coordinated with the City of Coquitlam Planning and Development Services Departments to obtain a Development Permit for the project, which included the preparation of the site servicing concept. H.Y. Engineering also provided engineering services for detailed design of the servicing and roadworks required for this project, as well as Erosion and Sediment Control (ESC) design and monitoring.